Concrete square feet cubic yard converter
Round Slab. Square Column. Round Column. Calculate concrete volume of steps Using measurements in feet: Number of Steps is the total number of steps including the platform. We calculate the volume in sections from the ground to the top of each section.
The platform and each step are each sections. Abbreviation or prefix abbr. How many cubic yards of concrete are in 1 cubic foot? In principle with any measuring task, switched on professional people always ensure, and their success depends on, they get the most precise conversion results everywhere and every-time. Not only whenever possible, it's always so. Often having only a good idea or more ideas might not be perfect nor good enough solution.
If there is an exact known measure in cu ft - ft3 - cubic feet for concrete amount, the rule is that the cubic foot number gets converted into cu yd - yd3 - cubic yards or any other concrete unit absolutely exactly. Conversion for how many cubic yards cu yd - yd3 of concrete are contained in a cubic foot 1 cu ft - ft3. Or, how much in cubic yards of concrete is in 1 cubic foot? To link to this concrete cubic foot to cubic yards online converter simply cut and paste the following.
The link to this tool will appear as: concrete from cubic foot cu ft - ft3 to cubic yards cu yd - yd3 conversion. So it is important to check a variety of spots on your footing and get an average size.
Then use the calculator to figure the amount of concrete needed. House slabs on grade that are 8" out of grade with a 4" slab also have some of the footing above the grade too. This 12" x 12" footing needs to be calculated 12" x 16" so the footing is figured to go above grade to reach the 4" slab thickness. This porch has 9 sq. This totals. The porch also has 9 linear feet of 6" step.
So enter in the footing calculator, 6" depth by 12" width always figure steps with a 12" width by 9' length. The total concrete needed for the 3' by 3' porch will be. Granite Construction has an excellent base fill calculator on their site. Use this to figure how much material you need for the subgrade. A perfectly placed order of concrete will finish the job with a small amount left over. A 20 cubic yard order with 1 cubic yard left over is a good order.
A 20 cubic yard order that comes up cubic yard short is not a good order. It can be upsetting to end up with any extra concrete. You are having to pay for this concrete after all. However, realize you are doing your job a service by ordering enough concrete - which means you are going to have a little concrete left. Compare the figure with what you came up with.
Discuss any variances with the supplier. Your ready mix supplier is invaluable for checking your view of job conditions, checking your margin of safety, identifying issues you may not have thought of, and informing you of any local conditions you need to be aware of.